In the following, we have compiled a short reference list from the more than 5,000 projects we have worked on, which shows the range of tasks we have taken on over the past 20 years. On request, we will also be happy to explain details to you or give you specific contact persons for our clients.
2006 – 2009
Subsoil investigation and foundation consulting for the new construction of the Nürburgring adventure region (with main building, Lindner Congress Hotel, Eifel village, "Ringracer" structure, tunnel in the area of the race track, pedestrian bridges, combined heat and power plant, rainwater basin and noise barriers)
2011
Foundation consulting, geostatic calculations and specialist construction management for the reconstruction of the Cologne-West motorway junction with a 5-span bridge (150 m), a bored pile wall (120 m), a single-span bridge (80 m), two angular retaining walls (100 + 120 m) as well as various roadway and embankment widenings
2012
A4 motorway between Düren and Kerpen junction (relocation of an approx. 12 km long motorway section in the area of the Hambach opencast mine), geotechnical consulting, stability investigations
2014
Subsoil investigation, stability assessment and rehabilitation concepts for the final dams of six ponds
2014
Earth Static Calculations for the Construction of an Automotive Test Track
2014 – 2017
Subsoil investigation, foundation consulting, concept for securing the neighboring buildings and structural analysis for the expansion of the Eifel Clinic
2015
Subsoil investigation, slope stabilization concept for incision embankments and foundation consulting for the construction of the DuraBASt test site
2015
Damage report on a major landslide in Linz (with, concept for the decommissioning of the landslide and supervision of the remediation work)
2015
Subsoil investigation and geotechnical consulting for an automotive test track
2016
Subsoil investigation and foundation consulting for the construction of a port transshipment facility
2016 - heute
Subsoil investigation and geotechnical consulting for the renovation of a harbour quay wall (length approx. 500 m)
2017
Subsoil investigation and foundation consulting for the large-scale project "TRW Campus 2020+"
2017 – 2020
Subsoil investigation, foundation consulting and initial status report for the new construction of the VA-13 industrial hall
2018
Subsoil investigation and geotechnical consulting and stability verifications for the rehabilitation of 5 rainwater retention basins
2018
Subsoil investigation and foundation consulting for the new construction of the new indoor swimming pool of the city of Koblenz
2019
Subsoil investigations and geotechnical reports for the expansion of the Weißenthurm "Vulkan" plant of Ardagh Metal Beverage Germany GmbH
2020
Subsoil investigation, foundation concept, risk assessment and soil protection concept for the new construction of the daycare center "In der Weiersbach"
2020
Subsoil investigation, foundation consulting and assessment of methane and carbon dioxide exhalations for the new construction of the monastery restaurant.
2020
Subsoil investigation, geotechnical consulting and risk assessment for the "Poststraße" realisation district
2020 bis 2023
Subsoil investigation, foundation consulting, stability verifications for excavation pit embankment and declaration analysis for the construction of a new hydropower plant
2021
Subsoil investigation as well as hydrogeological, geotechnical and environmental consulting for the development of a residential area on the site of the former Fritsch barracks
2021 bis heute
Subsoil investigation and foundation consulting for the new construction of the west wing of the "Hochhaus am Wöllershof"
2021
Subsoil investigations and geotechnical reports for the three construction phases of a pipe jacking for the rehabilitation of the sewage treatment plant in Sinzig after the Ahr flood in 2021
2022
Subsoil investigation and foundation consulting for the new construction of 32 temporary bridges after the Ahr flood in 2021
2022
Subsoil investigation and geotechnical report for the construction of a new logistics hall (external dimensions approx. 105 x 295 m)
2022
Subsoil investigation and geotechnical report for the "Dornbach 3.0" office complex
2023
Geological consulting for the construction of 133 electricity pylons between Pillig and Wengerohr